Skip to content Skip to sidebar Skip to footer
Good News in North Houston!
A three-month maintenance project addressing channel erosion along a tributary of White Oak Bayou is complete! Maintenance crews worked east of the intersection of Fairbanks North Houston Rd. and Battleoak Dr. to repair about 700 feet of toe line erosion, which is damage or erosion at the bottom of the slope where stormwater gradually washes…
Peak Hurricane Season Is Here
We’re at the peak of hurricane season, but the season is far from over. The Atlantic hurricane season officially runs through November 30 — meaning we still have about 80 days to go. Even after hurricane season ends, flooding can happen at any time. Stay aware of conditions in your area and know what’s happening…
Keeping Trash Out of Harris County Waterways
Trash dumped along streets, ditches, and bayous is more than an eyesore. When debris reaches a drainage channel, it can interfere with the movement of stormwater and create additional maintenance challenges. That concern was raised by residents during the September 8 Harris County Commissioners Court meeting. A Northeast Houston resident described illegal dumping in her…
Maintenance Underway Along Rolling Fork Channel
Years of stormwater conveyance have taken a toll on the Rolling Fork channel — a White Oak Bayou tributary in northwest Houston — resulting in erosion and sedimentation, which reduces how efficiently stormwater can be conveyed. Our maintenance team is making repairs to restore the channel and address areas that have deteriorated over time. The…
Commissioners Court Sets Public Hearing for Flood Control District Budget
Harris County Commissioners Court has taken the next step in the annual budget process for the Harris County Flood Control District, setting a public hearing for September 17, 2026. During its September 8 meeting, Commissioners Court unanimously approved moving the Flood Control District’s proposed budget forward for public consideration. The action follows discussions and amendments…
Be Ready Before the Next Storm
September is National Preparedness Month, a reminder that preparing for severe weather starts long before rain begins to fall. In Harris County, heavy rainfall and rapidly changing weather can create dangerous conditions with little warning. One simple step residents can take now is making sure they have access to reliable weather and flood information when…
Construction Activities on Phase 1 of the Stormwater Detention Basin on South Mayde Creek near the Grand Parkway Begin Soon!
Construction activities include contractor mobilization, initial site preparation, and other related work. Construction crews will be accessing the site at Stockdick School Road and Clay Road. About this Project Phase 1 of the Stormwater Detention Basin on South Mayde Creek near the Grand Parkway consists of two wet-bottom compartments designed to provide approximately 161 acre-feet…

About the Bayou Bulletin

The Bayou Bulletin, powered by the Harris County Flood Control District, shares stories of flood resilience in Harris County—highlighting people, projects, and progress. The Harris County Flood Control District, created in 1937, is governed by Harris County Commissioners Court.

All content is public and may be reproduced for informational purposes. The Harris County Flood Control District does not endorse its use for promotional purposes.