Four channels inside Barker Reservoir are receiving important maintenance as part of Harris County Flood Control District’s continued investment in maintaining and strengthening the region’s flood resiliency.
Over time, sediment buildup and erosion have affected the condition and performance of these channels. This maintenance project will restore the channels to their original design and help…
Across the Barker Reservoir watershed, aging flood control infrastructure has led to erosion, sediment buildup, and damage in many channels. Left unaddressed, this damage reduces how much stormwater these channels can carry compared to their original design capacity.
That’s why major maintenance work is now underway. The Flood Control District is restoring these channels to…
Across the Addicks Reservoir watershed, aging flood control infrastructure has led to erosion, sediment buildup, and damage in many channels. Left unaddressed, this damage reduces how much stormwater these channels can carry compared to their original design capacity.
That’s why major maintenance work is now underway. The Flood Control District is restoring these channels to…
Flood mitigation projects funded through federal programs often involve multiple steps before construction begins. Engineering, design, environmental review, bidding, permitting, land coordination, utility relocation, and federal approvals are all part of moving a project from planning into construction. While much of that work is not visible from the street, it can be essential to making…
Maintaining Harris County's flood flood resiliency systems requires ongoing work to restore channels, remove vegetation, and ensure infrastructure continues to function as designed long before the next heavy rain arrives.
That work is now underway in west Harris County as the Harris County Flood Control District launches the Barker Channel Rehabilitation and Restoration Project, a…
At the beginning of February, the Harris County Flood Control District conducted a prescribed burn on 440 acres of prairie and wetlands in northwest Harris County near the Katy Prairie. The burn was carefully planned and supervised by certified fire professionals to ensure it stayed safe and contained.
Why This Work Is Important
Prescribed burns…
You may start to notice small green patches forming along some of our channels and stormwater detention basins. While they may look like weeds at first glance, they’re actually young bluebonnets.
Bluebonnets begin as low-growing clusters of leaves called rosettes. They stay close to the ground through the winter months, building strength below the surface.…
The Harris County Flood Control District is currently working on an erosion repair project along Turkey Creek in the Memorial area.
Turkey Creek is a tributary of Buffalo Bayou. It starts in Addicks Reservoir and flows about six miles southwest, passing under Interstate 10 (U.S. 90), the Missouri, Kansas and Texas Railroad tracks, and the…
The Harris County Flood Control District recently completed important maintenance work along Bering Ditch in west Houston, within Harris County Precinct 3.
The Flood Control District is responsible for maintaining more than 2,500 miles of channels across the county and regularly inspects the channels and makes repairs when excessive wear or damage is identified.
For…
Strong partnerships are essential to building long-term resilience in Harris County. Through the Community Development Block Grant (CDBG) program, the Flood Control District can design and build projects that meaningfully reduce flood risk. These projects improve channel conveyance, create stormwater storage, and preserve floodplains that help mitigate flooding during major rain events.
Many communities with…
